Take control of your power, with a permanent generator installation.

IGA Ringwood East Generator Specifications

Completed June 2019. 250kva FG Wilson Generator 400amp ASCO ATS, 400 AMP ASCO ATS, solar system and power correction unit integrated with the backup generator in a Genset custom noise-cancelling enclosure.

Description

For IGA Ringwood East we designed and installed a permanent backup power unit in case of unscheduled power outages. Integrating the power correction unit and the solar system with the backup generator, we installed the generator in a custom enclosure to meet the noise requirements of the Ringwood council. Our electricians carried out a full assessment with onsite data loggers to understand the site load, before designing a power system that worked for them. Our team carried out all civil works and liaised with the power authority until the completion of the works, leaving IGA to focus on their business with renewed peace of mind.

‘We’ve experienced outages due to bad weather and we always rely on Genset Power to provide us with fast and reliable power solutions’- IGA Ringwood East


Rob Dolan Wines & The Farm Yarra Valley Generator Specifications

Completed March 2020. 350kva Deutz Generator, Two 250 amp Socomec ATS integrated with a solar system.

Description

Our electricians carried out a full assessment of the site with data loggers to understand the site load. Realising that the site required additional power to run cooling equipment during peak times, we designed a backup power supply with load monitoring capability to manage the power increase during the peak times. We carried out all the civil works, while liaising with the power authority to ensure compliance with the installation.

‘Knowing we have a reliable backup power source for our peak periods is very reassuring’ – Rob Dolan


Big4 Holiday Park Healesville Generator Specifications

Completed May 2020. 500kva Cummins generator, 630amp Socomec ATS

Description

Big4 Holiday park in Healesville was experiencing a limited and unreliable power supply from the grid, so we stepped in to set their mind at ease. We conducted a detailed site analysis to assess the peak load of the holiday park, and decided to install a new main switchboard with a top of the line Socomec ATS and a 500kva Cummings generator. We liaised with the power authority and completed all necessary civil works, including crane lift and excavation of the site. Now Big4 can operate with peace of mind knowing that they’ll never be left in the dark.

‘We had unreliable power from the grid because of our high load and remote location. Now we are confident to fill the park, knowing we have the capacity to power all our sites’


Balgownie Estate Yarra Valley Generator Specifications

Completed December 2018. 500kva Cummins generator, 800amp MSB

Description

Our electricians carried out a full assessment of the side with data loggers to gain a clear understanding of the site load. Due to the nature of their business, hosting weddings and conferences, we noted that sound considerations would be particularly important. Liaising with the power authority, we installed a 500kv Cummins generator away from the main site. We used directional drilling to install cabling for our 800amp MSB to ensure Balgownie Estate had a reliable, silent source of power for their events.

‘We’ve been very impressed with their professionalism and level of service’ – Balgownie Estate


Victorian Trailers Thomastown Generator Specifications

September 2019. Recommissioned used Dorman 1250kva generator, 9000lt bundled fuel cell, 1600amp MSB with Schneider motorised circuit breakers.

Description

Our electricians re-engineered the existing generator for Victorian Trailers and installed brand new Deep Sea controls. We installed a 9000lt bundled fuel cell and a 1600amp MSB with Schneider motorised circuit breakers to handle the site load. After liaising with the power authority, we designed and installed a custom exhaust system for the generator.

‘Genset were great to work with, adapting our existing generator with a new fuel tank and updated controls to maximise our value and minimise our new expenses.’

Testimonials

What’s Our Clients Say

We’ve experienced outages due to bad weather and we always rely on Genset Power to provide us with fast and reliable power solutions.

Ringwood East

We had unreliable power from the grid because of our high load and remote location. Now we are confident to fill the park, knowing we have the capacity to power all our sites

We’ve been very impressed with their professionalism and level of service.

Yarra Glen

24/7 Emergency Service

(03) 9068 5628

Contact us now to discuss your generator and power requirements and we will provide you with a customised quote.